Decisions

Use the below search options at the bottom of the page to find information regarding recent decisions that have been taken by the council’s decision making bodies.

Alternatively you can visit the officer decisions page for information on officer delegated decisions that have been taken by council officers.

Decisions published

05/11/2026 - Mortuary Condition Improvement Works ref: 3493    Recommendations Approved

To delegate associated spend of the Mortuary Condition Improvements budget to the Interim Director – Legal and Democratic Services for future works delivery.

Decision Maker: Director: Legal and Democratic Services (MO & SIRO)

Decision published: 09/11/2026

Effective from: 05/11/2026

Decision:

Priority funding for improvements to the Flax Bourton Mortuary was allocated through the annual 2026/27 Budget Report and agreed by Full Council in February 2026. An ODN is required to delegate spend up to the allocation value, to the appropriate officer, Interim Director- Legal and Democratic Services.

Lead officer: Michael Hewitt


05/11/2026 - Procurement of replacement Air Quality Monitoring Equipment ref: 3492    Recommendations Approved

As part of the Local Air Quality Management regime, Bristol City Council has statutory duties to monitor and report on Bristol’s air quality through Annual Status Reports required by DEFRA (Department of Environment, Food, and Rural Affairs). These reports are reliant on high-quality data provided by the council network of air quality monitors, including 7 real-time sites which monitor nitrogen dioxide (NO2) and particulate matter (PM). Bristol City Council transport schemes such as the Clean Air Zone and liveable neighbourhood schemes are also dependent on this data for their planning, monitoring and impact assessments. The monitoring equipment at all 7 real-time sites is reaching, or has already reached, the end of its expected lifespan and risks failure and so repair/refurbishment is to be undertaken at 7 sites.

Decision Maker: Director: Economy of Place

Decision published: 06/11/2026

Effective from: 05/11/2026

Decision:

To ensure the council can continue to collect high-quality air pollution data and carry out its legal monitoring and reporting duties and maintain safety, all ageing equipment and roadside enclosures at the 7 real-time monitoring sites will be replaced by 31st March 2027.

Lead officer: Alex Hearn


06/11/2026 - Replacement HRA Tipper Trucks ref: 3482    Recommendations Approved (subject to call-in)

To seek approval to procure and award a contract for 17 replacement HRA tipper trucks on a 5-year lease contract.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 14/11/2026

Decision:

The Homes and Housing Development Committee approved the Replacement HRA Tipper Trucks with option 2.1, for ?ve year diesel lease vehicles.

 

Option 2.1 – Avoids the long term ownership of a new diesel fleet whilst investing in the infrastructure required to transition to EV at renewal.

 

 

 

Wards affected: (All Wards);

Lead officer: Darren Smith


06/11/2026 - Housing Strategic Risk Register ref: 3489    Information Only

To note the new strategic risk register with a focus on the controls, mitigations and risk scoring and to note the risk appetite.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 06/11/2026

Decision:

The Homes and Housing Delivery Policy Committee:

 

1. Noted the proposed Housing Strategic Risk Register in Appendix A1

2. Noted that the register will be developed further to incorporate current performance, risk appetite, additional mitigating actions and alignment with the council’s corporate risk framework.

3. Noted that future updates will be reported to the Committee alongside the quarterly corporate risk update.

 

Wards affected: (All Wards);

Lead officer: Richard James


06/11/2026 - Housing Transformation Programme ref: 3487    Recommendations Approved (subject to call-in)

To seek approval of the scope and funding for the initiation of the Housing Transformation Programme.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 14/11/2026

Decision:

The Committee for Homes and Housing Delivery:

 

  1. Approved the proposal to initiate the Housing Transformation Programme.
  2. Authorised the Executive Director of Housing, in consultation with the Chair of the Homes and Housing Delivery Committee, to deliver Phases 1 and 2 of the programme within the maximum budget envelope of £972k, drawn from existing funding, outlined in this report.

 

Wards affected: (All Wards);

Lead officer: David McNulty


06/11/2026 - Q2 Tackling Homelessness Transformation Programme ref: 3484    Information Only

To note the Tackling Homelessness Transformation Programme update.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 06/11/2026

Decision:

The Committee for Homes and Housing Delivery:

  1. Noted the overall update provided on the Tackling Homelessness Transformation Programme as set out in this report
  2. Noted the report states that the Tackling Homelessness Programme’s financial objectives include £4,145,000 of recurring subsidy loss reduction in 2026/27.
  3. Noted the report states that as per approval of the Transformation funding at the Committee for Strategy and Resources on 25 May 2026, the Tackling Homelessness Programme revenue budget is £1,560,425 for 2026/27, plus the rollover of £346,535 from 2025/26 programme budget that was not spent. This gives a total budget of £1,906,960. A further £245,000 contingency fund is held centrally by Transformation Board.

 

Wards affected: (All Wards);

Lead officer: Tara Dillon


06/11/2026 - Housing & Consumer Standards Programme and Compliance Update ref: 3491    Information Only

To note the Housing & Consumer Standards Programme and compliance update.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 06/11/2026

Decision:

The Committee for Homes & Housing Delivery:

1. Noted the Housing Consumer Standards Programme update (see section 1).

2. Noted the August 26 landlord compliance performance report (see section 2).

3. Noted the current external assurance work underway (see section 3).

4. Noted the residents voice update (see section 4).

5. Noted the update from the latest regulatory review meetings with the RSH (see section 5).

 

Wards affected: (All Wards);

Lead officer: Richard James


06/11/2026 - Private Rented Sector Strategy ref: 3483    Recommendations Approved (subject to call-in)

To seek approval of the Private Rented Sector Strategy

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 14/11/2026

Decision:

The Committee for Homes and Housing Delivery approved Private Rented Sector strategy and action plan.

 

Wards affected: (All Wards);

Lead officer: Tom Gilchrist


06/11/2026 - Home Adaptations and Housing that Empowers People to Live Independently (Silver Motion) ref: 3486    Recommendations Approved (subject to call-in)

To note the points detailed in the silver motion and to seek approval of Accessible Homes cross tenure improvement plan to reduce waiting times for the assessment and installation of adaptations.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 14/11/2026

Decision:

The Committee for Homes and Housing Delivery

1.      Approved Homes Adaptations Improvement Plan

 

Contractual:

 

1. Authorised the Executive Director of Housing in consultation with [Chair of the Homes and Housing Delivery Committee] to extend and vary and award the Disabled Adaptations Framework 2025-29, in-line with the procurement routes and maximum budget envelopes outlined in this report.

2. Authorised the Executive Director of Housing to invoke any subsequent extensions/variations specifically defined in the contract(s) being awarded, up to the maximum budget envelope outlined in this report.

 

Wards affected: (All Wards);

Lead officer: Tom Gilchrist


06/11/2026 - Annual Complaints Report and Improvement Plan ref: 3488    Information Only

To note the outcome of the 2025/26 Housing Ombudsman Complaint Handling Code Self-Assessment; the identified areas of non-compliance with the Complaint Handling Code and the associated risks; the findings of the Annual Complaints Performance and Service Improvement Report; the actions underway to improve complaints handling performance and compliance with the Complaint Handling Code; and the measures being implemented to address identified performance issues and improve compliance with the Complaint Handling Code.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 06/11/2026

Decision:

Thae Committee for Homes and Housing Delivery noted the report.

 

Wards affected: (All Wards);

Lead officer: Mark Kempt


06/11/2026 - Q2 2026-27 Corporate Risk Report ref: 3490    Information Only

To provide an update of the current significant strategic risks to achieving the Council’s objectives as set in the Corporate Strategy and summarise progress in managing the risks/actions being taken for each quarter

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 06/11/2026

Decision:

The Homes and Housing Delivery Committee noted this report.

 

Wards affected: (All Wards);

Lead officer: Simba Muzarurwi


06/11/2026 - Homelessness and Rough Sleeping Strategy Action Plan – Year 2 Update ref: 3485    Recommendations Approved (subject to call-in)

To seek approval of our 3-year Local Outcomes Framework targets for homelessness and rough sleeping.

Decision Maker: Homes and Housing Delivery Policy Committee

Made at meeting: 06/11/2026 - Homes and Housing Delivery Policy Committee

Decision published: 06/11/2026

Effective from: 14/11/2026

Decision:

The Homes and Housing Delivery Policy Committee approved the action plan and the 3-year Local Outcome Framework targets for homelessness and rough sleeping.

 

Wards affected: (All Wards);

Lead officer: Paul Sylvester


15/09/2026 - Minutes of the Previous Meeting ref: 3360    Recommendations Approved

Decision Maker: Public Safety & Protection Sub-Committee

Made at meeting: 15/09/2026 - Public Safety & Protection Sub-Committee

Decision published: 04/11/2026

Effective from: 15/09/2026

Decision:

RESOLVED – that the minutes of the meetings held on 11 August 2026 be confirmed as a correct record and signed by the Chair.


02/11/2026 - Imperial Apartments referral agreement contract ref: 3481    Recommendations Approved

Imperial Apartments is a development of 466 units, located in South Bristol within the Hengrove and Whitchurch ward. The units are let as Private rented accommodation at the Local Housing Allowance and are managed by Caridon.
The City Council had a referral agreement to nominate to 282 of the units available. The previous contract was for a fixed 5-year period from 2021 ending in June 2026. There was a short extension to the contract to allow for negotiations to be completed on a new contract.
1.A new Referral Agreement was agreed on 30th July 2026 for 282 units of accommodation with a 5 year contract that includes a break clause at 2.5 years. The contract requires 6 months’ notice to terminate by either party.
2.These units are let at Local Housing Allowance rent levels and are Assured Periodic Tenancies under the Renters Rights Act 2026.
3.The new contract has reduced the costs to the Council. The Council retains a contractual obligation for void loss payments on units where no referral of prospective tenants has been made within 5 days.
4.The Council retains time limited liability for 50% of bed debt (rent arears) on currently occupied units that were commenced under Phase 1 of the previous contract. The 190 units will cease to be eligible for bad debt underwriting on the starting of a new Assured Periodic tenancy. As a result the liability for bad debt provision will reduce year on year.
5.Housing Options Managers meet with Caridon Regional Manager at a monthly joint management meeting to discuss all aspects of our referral agreement. Escalations of issues or complaints are included in the meeting agenda.

Decision Maker: Executive Director: Housing

Decision published: 02/11/2026

Effective from: 02/11/2026

Decision:

Authorises the Executive Director Housing in consultation with Chair of the Homes and Housing Delivery Committee to award the Imperial Apartments Caridon Group, Referral Agreement contract. To commence with effect from 30th July 2026 for a period of 5 years.

Lead officer: David McNulty


02/11/2026 - Nighttime Economy: Task and Finish Group- Election of Chair ref: 3479    Information Only

To note the election of the Chair of the Nighttime Economy Task and Finish Group that was established at Committee on the 28th September 2026

Decision Maker: Economy and Skills Policy Committee

Made at meeting: 02/11/2026 - Economy and Skills Policy Committee

Decision published: 02/11/2026

Effective from: 02/11/2026

Decision:

Thae Economy and Skills Committee noted the appointment of Councillor Louis Martin as Chair of the Night Time Economy Task and Finish Group.

 

Wards affected: (All Wards);

Lead officer: Ian Hird


02/11/2026 - Q2 Corporate Risk Report 26/27 ref: 3480    Information Only

To provide an update of the current significant strategic risks to achieving the Council’s objectives as set in the Corporate Strategy and summarises progress in managing the risks/actions being taken for each quarter

Decision Maker: Economy and Skills Policy Committee

Made at meeting: 02/11/2026 - Economy and Skills Policy Committee

Decision published: 02/11/2026

Effective from: 02/11/2026

Decision:

The Economy and Skills Committee noted this report.

Lead officer: Simba Muzarurwi


02/11/2026 - Planning Performance Update ref: 3477    Information Only

To provide an update on current performance against key indicators for measuring the quality and speed of the development management service delivery.

Decision Maker: Economy and Skills Policy Committee

Made at meeting: 02/11/2026 - Economy and Skills Policy Committee

Decision published: 02/11/2026

Effective from: 02/11/2026

Decision:

The Committee for Economy and Skills noted the update regarding planning performance.

Wards affected: (All Wards);

Lead officer: Simone Wilding


02/11/2026 - Development Viability Task and Finish Group update report ref: 3478    Information Only

To provide an update on the work of the Development Viability Task and Finish Group

Decision Maker: Economy and Skills Policy Committee

Made at meeting: 02/11/2026 - Economy and Skills Policy Committee

Decision published: 02/11/2026

Effective from: 02/11/2026

Decision:

Thae Committee for Economy and Skills noted the report.

 

Wards affected: (All Wards);

Lead officer: Alex Hearn


02/11/2026 - Council Housebuilding Support Fund (CHSF) 2026/27 Funding Application ref: 3476    Recommendations Approved

The Ministry of Housing, Communities and Local Government (MHCLG), administered through Homes England, has launched a further round of the Council Housebuilding Support Fund (CHSF) to support local authorities in increasing their capacity and capability to deliver affordable housing and bring forward ambitious bids to future Social and Affordable Homes Programme (SAHP) funding rounds.
The fund provides revenue funding of up to £300,000 per local authority in 2026/27, with further funding rounds anticipated in 2027/28 and 2028/29. The programme is intended to support pipeline development, feasibility work, specialist expertise, partnership development, capacity building and activities that accelerate future affordable housing delivery.
Bristol City Council has been invited to submit an application and has identified an opportunity to develop a programme focused on future regeneration, estate renewal and affordable housing pipeline development. This would support the identification, assessment and preparation of new affordable housing opportunities capable of progressing to future Social and Affordable Homes Programme funding bids and delivery.
The proposed programme would support activities that are additional to existing resources and programmes, helping to strengthen Bristol's future affordable housing pipeline and maximise opportunities to secure external housing investment.

Decision Maker: Executive Director: Housing

Decision published: 02/11/2026

Effective from: 02/11/2026

Decision:

To approve the submission of an application to the Council Housebuilding Support Fund (CHSF) 2026/27 for up to £300,000 of revenue funding.
The proposed application will seek funding to support a Bristol Regeneration and Affordable Housing Pipeline Programme, including activities such as:
Estate regeneration and renewal planning.
Future affordable housing pipeline development.
Site assessment and feasibility work.
Development appraisal and technical due diligence.
Preparation of future Social and Affordable Homes Programme proposals.
Capacity and capability enhancements to support future affordable housing delivery.
The application will seek to maximise external funding opportunities while creating additional affordable housing delivery opportunities for Bristol residents.

Lead officer: Sophie Bland


29/10/2026 - Micromobility Parking Phase 1 ref: 3474    Recommendations Approved

This is a delegated decision to confirm acceptance of £100,000 of funding from the the West of England Mayoral Combined Authority (MCA) to introduce painted parking bays for the Dott e-scooter/e-bike micromobility scheme.
The bays will improve tidiness of parking and predominantly relocate this onto the road, keeping pavements clearer and reducing the number of abandoned vehicles. It will also introduce more parking capacity in areas where this is currently lacking, improving connectivity and transport choices.
The MCA have provided this funding via the Future Mobility Zone project, which must be spent in financial year 2026/26 on projects relating to emerging/new modes of transport.

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 30/10/2026

Effective from: 29/10/2026

Decision:

Following consultation with the Chair of the Transport and Connectivity Committee, approval to accept the funding from the MCA and introduce 60 painted parking areas.

Lead officer: John Smith


29/10/2026 - Acceptance of Grant and Levy Funding for the Bedminster Green Trash Screen ref: 3473    Recommendations Approved

The River Malago Restoration project sets to restore a stretch of the River Malago through Bedminster, South Bristol. The scheme delivers flood storage and flood protection measures, alongside improved public realm and ecological benefits. An important part of this project is to install a trash screen to prevent debris from entering the culvert (that takes the Malago flows out to the River Avon under East Street (Bedminster)), as debris has previously entered the culverted and wedged the tide flap into River Avon open, causing tidal waters to flow back up the culvert and flood properties.
BCC has applied for Local Levy and Flood Defence Grant in Aid (administered by the Environment Agency) to fund the construction of this trash screen, which has been successful.
This ODN seeks approval to allow Bristol City Council (BCC) to accept funding from Local Levy and Flood Defence Grant in Aid, as a result of a successful bid to obtain funding to deliver a trash screen on the River Malago adjacent to Dalby Avenue (Bedminster), which will form an important part of the area's flood risk infrastructure.

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 30/10/2026

Effective from: 29/10/2026

Decision:

Approval to accept funding from Local Levy and Flood Defence Grant in Aid, as a result of a successful bid to obtain funding to deliver a trash screen on the River Malago adjacent to Dalby Avenue (Bedminster).

Lead officer: John Smith


27/10/2026 - North, East Central and City Centre Bristol Youth and Play Grants ref: 3472    Recommendations Approved

At Cabinet on the 7 March 2023 Cabinet approved the approach set out in the report to the development and grant funding of youth services in Bristol across 7 years and authorised the Executive Director Children and Education to take all steps required to agree grant terms and enter into grant agreements to award grants for youth services across the next 7 years at a total cost of £6m.
The grant funding is allocated to deliver services in North, East Central and City Centre Bristol. The decision aligns with the North, East Central and City Centre Bristol Locality Youth and Play Development Plan (2026–29).
The funding supports delivery across Priority 1-3 wards and underpins the successful implementation of the North, East Central and City Centre Bristol Area Action Plans, ensuring continuity of youth and play services including open access youth work, play ranger sessions, detached youth work and targeted provision. This approach is consistent with the Council's established locality-based youth model developed through the South Bristol Area programme and complements the wider city-wide youth infrastructure, including the 224 Youth Zone.
The programme will operate alongside the DCMS-funded Young Futures Hub in East Central Bristol and supports delivery of the Local Youth Transformation Programme, strengthening early-help pathways, improving access to high-quality youth provision and reducing inequalities for young people across neighbouring priority wards.

Decision Maker: Executive Director: Children & Education (DCS)

Decision published: 29/10/2026

Effective from: 06/11/2026

Decision:

Approve allocation of multi-year (1 October 2026 to 31 September 2029) grant funding totalling £1,901,421 over the 3 years to a number of providers.

Lead officer: Hannah Woodhouse


19/08/2026 - NXG Fiscal renewal contract ref: 3471    Recommendations Approved

NXG Fiscal software provides the council with a specialist forensic analytics tool that identifies potential payment errors prior to payment being made. This includes the identification of duplicate payments, supplier anomalies and indicators of potential fraud. The software complements the council's corporate finance system, providing functionality that is not available within the core platform. The system is embedded within existing financial control processes and continues to support the council's financial governance arrangements. The renewal also enables access to future product enhancements, including further invoice audit, assurance and compatibility functionality.

Decision Maker: Executive Director: Resources

Decision published: 27/10/2026

Effective from: 19/08/2026

Decision:

Following consultation with Corporate Finance, Accounts Payable and Procurement, to renew the existing contract with NXG Fiscal for a period of three years. Renewal represents the most advantageous option, providing continuity of service, maintaining established financial controls, avoiding implementation and transition costs, and enabling access to future invoice audit, assurance and compatibility enhancements.

Lead officer: Andy Rothery


26/10/2026 - Bristol Debris Screen Programme ref: 3470    Recommendations Approved

£150,000 of Flood Defence Grant in Aid (FDGiA) funding from the Environment Agency has been allocated to Bristol City Council (BCC). This is to develop a programme of works to provide improvements to priority debris screens in the city. A debris screen is a flood risk asset often found in open channel sections of watercourses at the point where it flows below ground into pipes and culverts. The screen is designed to catch waste and debris to prevent internal blockages and flooding problems occurring. There are debris screens in Bristol that need replacing and those that pose the greatest risk will be prioritised. This project will devise a means of bringing seven debris screens back up to a suitable condition, in line with current standards and specifications, so that they perform their intended function effectively. BCC will utilise their Strategic Partnership to provide detailed engineering designs, develop the business case, and identify funding mechanisms to enable their construction.

Decision Maker: Director: Economy of Place

Decision published: 27/10/2026

Effective from: 26/10/2026

Decision:

Approval to accept the FDGiA funding made available to find a suitable way forward in making important upgrades to those existing debris screens that require the most immediate attention.

Lead officer: Alex Hearn


21/10/2026 - Application to Museum Transformation Programme ref: 3469    Recommendations Approved

The Museum Transformation Programme is a one-off funding pot from DCMS being distributed by Arts Council England. It is specifically for local authority led / associated museums designed to build on the funding need identified during the 2025-26 Museum Renewal Fund programme by enabling museums to address the longer-term challenges they face - supporting them to undertake the fundamental shift in their operational models that is required to increase their long-term financial resilience and operational sustainability, keep sites open and collections accessible to all, and continue to deliver for their audiences and communities.
We propose applying for up to £450,000 to support digital transformation across the city’s museums. The funding would enable the development of revenue streams utilising museum collections, the implementation of a unified CRM across museum departments, collections management software to increase free public access to collections online,
and the creation of temporary posts to support project delivery and implementation.
The maximum award available is up to £1m, however, the overall funding pot is £16m and the fund is open to all civic museums. It would be unlikely that we would be awarded the maximum value and have put together a programme of works that is achievable and sustainable, benefiting the grant criteria and ultimately the long term financial resilience of BCC’s Museum Service.

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 27/10/2026

Effective from: 21/10/2026

Decision:

Approval to apply for, accept, and spend Museum Transformation Programme funding from DCMS via Arts Council England.

Lead officer: John Smith


22/10/2026 - Window Replacement and Associated Works Framework 26-29 ref: 3467    For Determination

The existing framework is expiring and is no longer sufficient for delivery of the budget. A new framework contract to supply and install windows to domestic properties as well as associated works within Bristol City Council has been tendered and awarded through the Proactis system.

Approval to award a new framework contract is required to enable multiple supply routes for the installation of windows and window servicing to domestic properties within Bristol City Council. These works were included in the 26/27 Housing Investment Plan (HIP) which was signed off by the Strategy and Resources committee Feb 2026. This Framework will have an overall contract value of £15,000,000.00 (million) over 36 months with an option to extend it for a further 12 months. The new framework needs to be in place by the end of November 2026. Budgets will come from the Housing Revenue Account (HRA) Capital Works. Annual spend at present is approx. £2,500,000. This is within the bounds of the 10 year HIP

Delegations approved at Strategy and Resources committee in Feb 2026:

1.3. To Executive Director of Housing in consultation with Chair of the Homes and Housing Delivery Committee and s151 Officer to submit appropriate funding applications (including Homes England grants for development and any over the key decision threshold) to support the HRA budget and in particular the delivery of the HIP and Development Programme and if successful to:

1.3.1. accept funding and agree associated grant terms/conditions; and

1.3.2. utilise the funding for delivery of the projects set out in appendices HIP and Development Programme; and

1.4. To the Executive Director of Housing in consultation with Chair of the Homes and Housing Delivery Committee:

1.4.1. To approve the priority of the procurement projects set out in the HIP and take all steps required to select the appropriate procurement route and to procure and award the contracts in line with the council’s procurement rules and regulations. Such authority to include decisions on matters which exceed the key decision threshold within the envelopes outlined in this budget.

Approved at Full Council 12th Feb 2026. The Lord Mayor moved recommendations 1.1 to 1.10 in the budget report, seconded by the Deputy Lord Mayor.

1.10. That authority is delegated to the Executive Director Resources (S151 Officer) in consultation with the Chair of Strategy and Resources Committee, following the 2026/27 Final Local Government Finance Settlement, to make any adjustments that may be required to the budget following Full Council February 2026.

Decision Maker: Executive Director: Housing

Decision published: 23/10/2026

Effective from: 31/10/2026

Decision:

To replace windows that are beyond repair and have been identified as end of life. New windows need to be fitted to enable homes to be of a decent standard, compliant with legal requirements.

To carry out a window servicing programme to all our high rise properties.

To carry out window repairs as necessary to prolong the lifespan.

This is an above threshold Works Framework Contract. A full compliant Open Tender was regarded as the best way to ensure value for money.

Lead officer: David McNulty


23/10/2026 - RIBA Stage 3 architect appointment for South Bristol Creative Campus and Skills Academy at The Bottle Yard Studios ref: 3468    Recommendations Approved

External appointment of architect is required to develop RIBA Stage 3 designs for the refurbishment of underutilised office buildings on The Bottle Yard Studios site for a new Creative Campus and Skills Academy. This is required to progress the project and ensure delivery is achievable within the required window for the grant funding that is being sought.

Decision Maker: Director: Economy of Place

Decision published: 23/10/2026

Effective from: 23/10/2026

Decision:

Approval for officers to commission and instruct architects Atkins, Walters, Webster Ltd, through Constellia, to undertake RIBA Stage 3 design work for the South Bristol Creative Campus and Skills Academy project.

Lead officer: Alex Hearn


22/10/2026 - Update on the Bristol City Council City Region Sustainable Transport Settlement programme including the financial position ref: 3447    Recommendations Approved

To provide an update on the City Region Sustainable Transport Settlement (CRSTS) programme and seek approval for decisions on specific projects in response to changes in financial forecasts and funding profiles.

Decision Maker: Transport & Connectivity Policy Committee

Made at meeting: 22/10/2026 - Transport & Connectivity Policy Committee

Decision published: 23/10/2026

Effective from: 31/10/2026

Decision:

That the Committee for Transport and Connectivity:

1.      Noted the process and prioritisation of projects to manage the financial position of CRSTS.

 

2.      Approved a revised total budget for Work Package 1 (Victoria Street) from £6,245,143, representing a cumulative increase of £680,000 from the original approved budget of £5,565,143 of which £200,00 was previously transferred in April 2026 and £480,000 is the additional approval sought through this report. Any remaining funding not spent will be returned to the CRSTS programme wide contingency pot.

 

3.      Approved the increase in the approved expenditure for the A4 Portway corridor scheme from £23.1m to £27m which would include £1m of contingency. Approve that the additional funding requirement will temporarily be met through the allocation TCR Integrated/Maintenance Transport Block. Only funding required in the short term will be drawn down and that the TCR Integrated/Maintenance Transport Block funding would need to be replenished to avoid impacts on future maintenance commitments. 

 

4.      Resolved that any final decision to reallocate funds, over the key decision threshold, to replenish the TCR Integrated / Maintenance Transport Block will be made by the Transport and Connectivity Committee.

 

 

Lead officer: Adam Crowther


22/10/2026 - Performance management report – Q1 2026/27 ref: 3449    Information Only

To update on the Council’s Performance Management Report for Q1 2026/27.

Decision Maker: Transport & Connectivity Policy Committee

Made at meeting: 22/10/2026 - Transport & Connectivity Policy Committee

Decision published: 23/10/2026

Effective from: 22/10/2026

Decision:

The Committee for Transport and Connectivity noted the Performance progress report

Lead officer: Rebecca Baldwin-Cantello


22/10/2026 - 20 mph Review ref: 3445    Recommendations Approved

To seek approval following consultation to implement 20mph speed limits on roads across Bristol.

Decision Maker: Transport & Connectivity Policy Committee

Made at meeting: 22/10/2026 - Transport & Connectivity Policy Committee

Decision published: 23/10/2026

Effective from: 31/10/2026

Decision:

That the Committee for Transport and Connectivity:

 

1:  Noted the Public Engagement Report (Appendix A3) and the Responses to Public Engagement and Officer Recommendations (Appendix A2), which set out the details of and the reasons for the report recommendations. 

 

2: Authorised, subject to further statutory consultation through the Traffic Regulation Order process, the Executive Director Growth and Regeneration in consultation with the Chair of Transport and Connectivity Committee to take all steps required to introduce new 20mph speed limits on: 

 

  1. 17 roads or groups of roads in ‘Group 1’, as identified in Appendix A2, 4.1 pp24-30 and Appendix A4 p3-4.   
  1. 9 roads or groups of roads in ‘Group 2’ as identified in Appendix A2, 4.1, pp24-30, and in the maps in Appendix A1 and Appendix A4 p5  
  1. 14 roads or groups of roads in ‘Group 3’ as identified in Appendix A2, 4.1, pp24-30, and in the maps in Appendix A1 and Appendix A4 p6. 

 

3: Noted the officer recommendations to retain 30mph speed limits on 5 roads or groups of roads in ‘Group 4’ and 7 roads or groups of roads in ‘Group 5’, as identified in Appendix A2, 4.2 & 4.3, pp30-31 and Appendix A4 p7.  

 

4a: Committee APPROVED new 20 mph speed limits on Falcondale Road and Westbury Road between near the junction with Downs Cote Park and the roundabout at Redland Hill;

 

5a: Committee APPROVED a new 20mph speed limit on Bath Road between Three Lamps and the most technically suitable location south of the junction with King’s Road, to be identified at detailed design stage.

 

6 Committee APPROVED new 20 mph speed limits on (Wells Road (South)): Approved a new 20mph speed limit on Wells Road, between the existing 20mph speed limit near the border between Bristol City Council and Bath and North East Somerset  Council (B&NES) and the junction with Whitecross Avenue as set out in Appendix A4 p13-14. 

 

7 (Knole Lane): Committee APPROVED a new 20mph speed limit on Knole Lane as set out in Appendix A4 p15-16. 

 

8a: Committee APPROVED a new 20mph speed limit on Greystoke Avenue between Passage Road and Doncaster Road.

 

9 (Filton Avenue): Committee APPROVED removing the proposal for a new 20mph speed limit on Filton Ave from this project, to be included instead in the list of measures to be consulted upon by the Cribbs Patchway New Neighbourhood A38 Corridor Works looking to provide measures to enhance pedestrian, cycle and public transport provision on the A38 corridor and adjoining roads between Filton and Horfield, as previously approved by Transport and Connectivity Committee on 14th May 2026. More details in Appendix A4 p19.

 

10 (Stoke Bishop): Committee APPROVED a new 20mph speed limit on: 

  • Shirehampton Road / Parry’s Lane, from Kings Weston Road to the existing 20mph speed limit on Parry’s Lane near Cote Paddock 
  • Druid Hill / Stoke Hill 
  • Sylvan Way / Dingle Road between Coombe Lane and near Woodleaze 

As set out in Appendix A4 p20-21. 

 

11 (Stockwood): Committee APPROVED a new 20mph speed limit on: 

  • West Town Lane, between the existing 20mph speed limit and Wells Road, Sturminster Road, Stockwood Road, and Craydon Road 
  • Stockwood Lane 

As set out in Appendix A4 p20-21. 

 

12 (Bishopsworth): Committee APPROVED a new 20mph speed limit on: 

  • Kings Head Lane and Highridge Green 
  • Grange Road, Church Road, Whitchurch Lane, and Bishopsworth Road 
  • Parson Street, Bedminster Down, and Bedminster Road 
  • Bishopsworth Road, from Banwell Close to Bedminster Down Road 

As set out in Appendix A4 p20-21. 

 

13 (Airport Road): NOTED the officer recommendations to retain 30mph speed limits on Airport Road as set out in Appendix A4 p22-23. 

 

14: Authorised, subject to further statutory consultation through the Traffic Regulation Order process, the Executive Director Growth and Regeneration in consultation with the Chair of Transport and Connectivity Committee to take all steps required to introduce the new 20mph speed limits as approved by this Committee. 

 

15: Authorised the drawdown of up to £300,000 from the “Clean Air Zone contribution to local transport projects”, as required, providing a maximum total capital funding envelope of £800,000 to deliver the speed limit changes approved by Committee, and authorises the Executive Director Growth and Regeneration in consultation with the Chair of the Transport and Connectivity Committee to take all steps required to spend the funding (including procuring and awarding contracts over the key decision threshold) to deliver the speed limit changes as set out in this report.

 

16: Noted that officers will profile the existing £500,000 capital budget, together with any additional funding approved under recommendation 15, across the 2026/27 and 2027/28 financial years, in line with the anticipated delivery programme.

 

Wards affected: (All Wards);

Lead officer: Adam Crowther


22/10/2026 - Concorde Way (Dovercourt Road) cycling scheme Full Business Case ref: 3446    Recommendations Approved

To seek approval to submit the Full Business Case (FBC) to the West of England Mayoral Combined Authority (MCA) for Concorde Way (Dovercourt Road) cycling scheme.

Decision Maker: Transport & Connectivity Policy Committee

Made at meeting: 22/10/2026 - Transport & Connectivity Policy Committee

Decision published: 23/10/2026

Effective from: 31/10/2026

Decision:

That the Committee for Transport and Connectivity

1.      Approved the submission of the Full Business Case (FBC) to the West of England Mayoral Combined Authority (MCA).

 

Contractual:

1.      Authorised the Executive Director of Growth and Regeneration in consultation with the Chair of the Transport and Connectivity Committee to accept the funding offered on MCA’s approval of the FBC and award the relevant construction contract(s), in-line with the procurement routes and maximum budget envelopes outlined in this report.

 

2.      Authorised the Executive Director of Growth and Regeneration to approve extensions or variations specifically provided for within the awarded contract, within the confirmed maximum scheme budget and external funding envelope, with no additional unfunded commitment to the Council.

 

Lead officer: Adam Crowther


22/10/2026 - Local Transport Programme update ref: 3448    Information Only

  1. To provide an update on the existing local transport projects that are earmarked for delivery.
  2. To provide an update on the current prioritisation process for the new local transport projects that are being developed through Area Committees.

Decision Maker: Transport & Connectivity Policy Committee

Made at meeting: 22/10/2026 - Transport & Connectivity Policy Committee

Decision published: 23/10/2026

Effective from: 22/10/2026

Decision:

The Committee for Transport and Connectivity noted the local transport programme update.

 

Lead officer: Adam Crowther