Modern.gov Breadcrumb

Modern.gov Content

Decisions

Use the below search options at the bottom of the page to find information regarding recent decisions that have been taken by the council’s decision making bodies.

Decisions published

06/10/2022 - Approval of funding to be allocated to Community-led Housing (CLH) providers in accordance with the Affordable Housing Funding Policy (AHFP) 2022-25 ref: 1501    Recommendations Approved

The Council has up to £4.4m of capital funding to be allocated to support the delivery of affordable housing in the City. The Council has made a political commitment to supporting community-led housing in the City and this is the first bid round under the approved AHPN 2022 – 2025.

Decision Maker: Director: Housing and Landlord Services

Decision published: 20/10/2022

Effective from: 06/10/2022

Decision:

Approves the allocation of grant from the Affordable Housing Budget under the first bid round of the AHFP 2022 – 2025 to three CLH providers (subject to grant conditions) to support the development of 64 affordable homes across the following four projects:
Turner Gardens, Lockleaze - Lockleaze Neighbourhood Trust and HomeMade - £375,000 - 4 units
Constable Road, Lockleaze - Lockleaze Neighbourhood Trust - £1,530,000 - 19 units
Astry Close, Lawrence Weston - Ambition Lawrence Weston and Brighter Places - £1,534,000 - 36 units
Filwood

Lead officer: Louise Baker


10/10/2022 - HIF Grant to Southmead Development Trust for pre-development infrastructure works at Glencoyne Square ref: 1498    Recommendations Approved

To facilitate the provision of community-led affordable housing and community space.

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 11/10/2022

Effective from: 10/10/2022

Decision:

BCC will grant £458,855 to Southmead Development Trust (SDT) for pre-development infrastructure abnormal works at Glencoyne Square, following a separate grant of £281,145 for pre-development related costs in support of a new planning application. This grant is being made separately following Homes England’s recent approval of the re-allocation of further funding for development abnormals. This will support the delivery of community-led affordable housing, a new library, and community space. This funding is provided by Homes England through a £3.6m Housing Infrastructure Fund grant, and the funding re-allocation has been agreed in principle and a deed of variation on the contract is underway. Cabinet approved the acceptance and expenditure of the HIF grant on 3 July 2018, with an update on 2 July 2019.

Lead officer: Louise Baker


15/09/2022 - Responsive Repairs Framework ref: 1497    Recommendations Approved

The procurement route selected was a full OEJU process. The value and scope of works of the Responsive Repairs Framework deems a full open OEJU process as the most appropriate and transparent route to market

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 06/10/2022

Effective from: 15/09/2022

Decision:

Approval to award a new Responsive Repairs Framework Contract following a full and comprehensive tender process. The framework covers responsive repairs and refurbishment to properties consisting of domestic properties spread geographically throughout the city.
The framework is divided into 5 geographical areas (Lots).
Properties will be both tenanted and empty.
The domestic property portfolio of Bristol City Council consists of a mixture of social housing (around 31,000 properties) plus, garage sites, Traveller sites and Hostels.

Lead officer: Louise Baker


27/09/2022 - Defra Air Quality Grant – Installation of electrical supplies for outdoor events ref: 1496    Recommendations Approved

To secure additional resources to help the city council reduce NOx, particulate, CO2 and noise pollution from diesel generators.

Decision Maker: Director: Economy of Place

Decision published: 04/10/2022

Effective from: 27/09/2022

Decision:

To approve the submission of a grant application to Defra and if successful accept that grant and deliver the project. The funding is to BCC to upgrade and install significant electrical power supplies to allow events such as the harbour festival and traders to use renewable electricity, rather than relying on polluting diesel generators.

Lead officer: Louise Baker


20/09/2022 - BSH/HRA Asbestos Removals and Air Reassurance Testing Framework ref: 1495    Recommendations Approved

The route to market and implementation of the new framework was the most suitable for the works required, due to the incumbent asbestos removals framework coming to an end.

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 04/10/2022

Effective from: 20/09/2022

Decision:

Approval to award a new asbestos removals and air reassurance testing framework contract, following a full tender exercise. The incumbent asbestos removals framework is coming to an end in October 2022. The new framework includes a separate lot for air reassurance testing due to changes in regulations that these works need to be carried out by a supplier independent of the licenced removal contractor. The framework also includes a lot for Building Practice to utilise for their removals.

Lead officer: Louise Baker


01/08/2022 - Girls Affected by Gang Exploitation Grant ref: 1494    Recommendations Approved

Bristol City Council has been successful in securing a Home Office grant from the Women

Decision Maker: Director: Children, Families & Safer Communities

Decision published: 04/10/2022

Effective from: 01/08/2022

Decision:

To fund a gender-specific ring-fenced resource as part of our specialist Serious Youth Violence/CCE team using grant funding received from the Home Office Women

Lead officer: Gail Rogers


21/09/2022 - Health and Wellbeing Grant Investment ref: 1493    Recommendations Approved

On 3rd March 2022, Cabinet authorised and delegated the Executive Director, People to spend additional S256 funds of up to £2.24m. A Community Health and Wellbeing Fund has been set up which will be managed for and behalf of the Council by Quartet Community Foundation.
The agreement of the S256 was the provision of matched funding from previously allocated COVID funding for grant investment to support the recovery and resilience of the community and voluntary sector.

Decision Maker: Executive Director: Children & Education (DCS)

Decision published: 04/10/2022

Effective from: 21/09/2022

Decision:

To approve the arrangements and terms of the Community Health and Wellbeing Fund being managed for on behalf of the council by Quartet Community Foundation to spend an additional £2M from S256 funds (from the Clinical Commissioning Group for the BNSSG Healthier Together single system plan)

Lead officer: Penny Germon


04/10/2022 - Flexible-level supported homelessness accommodation service (Temporary Accommodation Services) ref: 1479    Recommendations Approved

To approve and award a contract.

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet:

1. Authorised the Executive Director of Growth and Regeneration in consultation with Cabinet Member for Housing to take all steps required to procure and award the contract(s) necessary for the implementation of flexible supported exempt accommodation framework until 31 March 2026 as outlined in this report.

2. Authorised Executive Director of Growth and Regeneration to invoke any subsequent extensions/variations specifically defined in the contract(s) being awarded, up to the maximum budget envelope outlined in this report.

 

Lead officer: Paul Sylvester


04/10/2022 - Refreshing permission to construct the A4018 scheme following a change in funding source ref: 1481    Recommendations Approved

To note the changed budget and funding source for the approved A4018 scheme, and approve and authorise spend of the updated total to implement the scheme.

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet:

  1. Authorised the Executive Director, Growth and Regeneration, in consultation with the Cabinet Member for Transport, to take all steps required to spend the funding including to procure and award the contract(s) (including individual contracts above £500k) necessary for the implementation of this section of the A4018 scheme, in-line with the procurement routes and maximum budget envelopes outlined in this report.
  2. Noted the changed budget and funding source for the approved A4018 scheme for the works on Passage Road between Crow Lane and Charlton Road.

 

Lead officer: Steven Riley


04/10/2022 - Parking Tariff Review 2022-23 (Controlled Parking Zone (City Centre) and Off Street Car Parks) ref: 1480    Recommendations Approved

To seek approval to increase parking tariffs in the Central Controlled Parking Zone (CPZ) and the Council’s off-street car parks.

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

The Cabinet:

1. Approved the parking tariff changes in the Central Controlled Parking Zone and the council’s off street car parks as laid out in this report and Appendix A.

2. Authorised the Executive Director Growth and Regeneration in consultation with the Cabinet Member for Transport to undertake the necessary statutory procedures to implement these changes as outlined in this report and in Appendix A.

3. Noted that as part of the implementation of the second phase, the off Street Parking Order will be consolidated and will be updated to reflect minor changes to terminology, definitions, times & permits to reflect current operating procedures and current technology.

 

Lead officer: David Bunting


04/10/2022 - HRA Budget Amendment (2022/23) ref: 1478    Recommendations Approved

To seek approval for additional expenditure in 2022/23 to be funded from the Housing Revenue Account reserves.

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet:

1. Authorised the Executive Director of Growth and Regeneration in consultation with the Cabinet Member for Housing Delivery and Homes to spend up to £3m from reserves across the three areas identified in the report (fund HRA play area refurbishment, a new fire safety inspection regime and increased energy costs).

2. Authorised the Executive Director of Growth and Regeneration, in consultation with the Section 151 Officer and Cabinet Member for Housing Delivery and Homes (with appropriate legal and procurement advice) and, subject to keeping within the approved overall identified budgets, to implement the new pas 9980 inspection regime and HRA play and multi-use games area improvement programme including:

• taking all steps necessary to procure and award contracts (including goods, works and professional services and any over the key decision threshold) during 2022/23 to deliver the identified programmes to determine the play and muti-use games areas prioritised for refurbishment.

 

Lead officer: Sarah Spicer


04/10/2022 - Technology Enabled Care Project (TEC2) ref: 1477    Recommendations Approved

For Cabinet to approve the use of Capital and Health funding to maximise Technology Enabled Care (TEC) for Adult Social Care service users as part of their packages of care and the expansion of the TEC team to deliver an increase in the utilisation of Technology Enabled Care in Bristol.

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet

1. Noted the benefits delivered to date through the TEC service in supporting Bristol’s citizens and supports the extension of the TEC service within the City in accordance with the business case at Appendix A.

2. Approved the funding request of £769,813 to support the delivery of the objectives set out in the Business Case over the next two years.

3. Authorised the Executive Director for People, in consultation with the Cabinet Member for Adults Social Care and the Integrated Care System, and the Cabinet Member for Housing Delivery and Homes, to take all steps required to spend the funding (including procuring and awarding contracts) to deliver the TEC2 project as outlined in this report.

4. Noted the submission of five expressions of interest to the NHS for ASC Digital Transformation Fund (DTF) FY 22/23 for £3,281,480 on 5th September 2022 as outlined in the report.

5. Authorised the Executive Director for People, in consultation with the Cabinet Member for Adults Social Care and the Integrated Care System, and the Cabinet Member for Housing Delivery and Homes, to take all steps required, if the bids are successful, to accept and spend the ASC DTF funding as outlined in this report including procuring and awarding contracts which may be over £500k.

Lead officer: Tom Gilchrist


04/10/2022 - Procurement of household goods contract in respect of the LCPF ref: 1484    Recommendations Approved

To seek approval to procure and award the household goods contract in respect of the Local Crisis and Prevention Fund (LCPF) for a period of up to 5 years.

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet:

1. Approved the procurement of a contract/s to deliver the Local Crisis and Prevention Fund’s and Temporary Accommodation Furnished Tenancies scheme household goods contracts.

2. Authorised the Director of Finance in consultation with the Deputy Mayor with responsibility for Finance, Governance, Property and Culture, to take all the steps necessary to procure and award both contracts up to the value of £5m from 1st April 2023 up to 31st March 2028.

 

Lead officer: Matthew Kendall


04/10/2022 - Q2 Corporate Risk Management Report 2022/23 ref: 1488    Information Only

To provide an update of the current significant strategic risks to achieving the Council’s objectives as set in the Corporate Strategy and summarises progress in managing the risks/actions being taken for each quarter .

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 04/10/2022

Decision:

That Cabinet

1. Noted the current strategic risks and mitigating actions being taken to reduce to within tolerance.

 

Lead officer: Denise Murray


04/10/2022 - Q1 Quarterly Performance Progress Report 2022/23 ref: 1487    Information Only

To update on the Council’s Performance Management Report for Q1 2022/23

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 04/10/2022

Decision:

That Cabinet noted the Thematic Performance Clinic reports and Performance progress, and the measures to address performance issues.

 

Lead officer: Guy Collings


04/10/2022 - Temple Quarter Grant Funding Arrangements ref: 1482    Recommendations Approved

To seek approval to enter into a grant flow down agreement with the West of England Combined Authority (‘WECA) and a Collaboration Agreement with WECA, Network Rail and Homes England to apply for and secure funding to deliver Infrastructure Items within Temple Quarter

To note the intention to explore options to appoint a delivery partner for a joint venture vehicle with the Temple Quarter partners to facilitate delivery of the Temple Quarter Programme.

To provide an update on the Temple Island Enabling Works project.

 

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet:

Grant Funding Agreement:

1.      Authorised the Executive Director Growth and Regeneration in consultation with the Deputy Mayor and Cabinet member for Finance, Governance, Property and Culture, Director of Finance and Director Legal and Democratic Services to take all necessary steps to negotiate the terms of and thereafter enter into both the initial Flow Down Agreement with WECA (including the Reinvestment Strategy) and a Collaboration Agreement with WECA, HE and NR.

2.      Authorised the Executive Director of Growth and Regeneration to (a) agree the terms of offer letters with WECA and thereafter draw down funding to prepare Delivery Plans for the relevant Infrastructure Items for which the Council is to be responsible (including procuring and awarding contracts in relation to all necessary services, including any in excess of £0.5m) and (b) submit these Delivery Plans to WECA. Noting that in the event that WECA are minded to approve the Delivery Plan, further approval will be sought from Cabinet prior to entering into the relevant offer letter and/or modified flow down agreement.

3.      Authorised the Executive Director of Growth and Regeneration to submit an application to WECA for funding of up to £7.843m to increase capacity in the Joint Delivery Team, and to the extent that the application is successful to then accept and drawdown and spend this funding accordingly including procuring and awarding contracts over £0.5m.

4.      Authorised the Executive Director Growth and Regeneration in consultation with Deputy Mayor and Cabinet member for Finance, Governance, Property and Culture, Director of Finance and Director Legal and Democratic Services to take all steps required to negotiate and agree with Network Rail, Homes England and WECA (a) the establishment of a joint venture arrangement (comprising a corporate body) (as summarised in the report) and (b) the appointment of a joint delivery partner, noting that further Cabinet approval will be sought to any transfer of BCC functions or responsibilities to the JV body.

 

Temple Island Enabling Works:

1.      Authorised the Executive Director of Growth and Regeneration, in consultation with the Mayor, S151 officer and Director Legal and Democratic Services to continue spend of the grant secured from WECA of up to £32m and procure and award all contracts within the funding envelope (for the avoidance of doubt, including contracts with a value of over £0.5m) required to undertake and complete the Temple Island Enabling Works.

2.      Noted that the high-level anticipated cost plan (figure 2) includes a risk and contingency budget item that will be held by the project to spend on unknowns.

3.      Noted that the breakdown/allocation of the figures presented in the high-level anticipated cost plan (figure 2) are subject to change and may be amended by the Executive Director of Growth and Regeneration in consultation with Deputy Mayor and Cabinet member for Finance, Governance, Property and Culture and Finance officers within the overall funding envelope outlined in this report. Any changes to the cost plan will be subject to acceptance of a Change Request by the Joint Committee as per the funding terms.

 

 

Lead officer: Abigail Stratford


04/10/2022 - Financial update report - October 2022 ref: 1486    Recommendations Approved

To present Cabinet with the latest detailed financial outturn report and identify any additional financial approvals that are required.

 

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet Noted

1.      The General Fund risk adjusted forecast overspend of £11.0m

2.      A forecast overspend of £2.0m within the HRA and that over or under spends that materialise on the HRA will be funded by a transfer to or from the HRA general reserve at the end of the financial year.

3.      A forecast in-year deficit of £19.9m accumulating to a total £44.6m carried forward deficit in the DSG for 2023/24, and the requirement for the Council and the Schools Forum to work together to develop a clear mitigation plan which addresses the High Needs overspend.

4.      A breakeven position on Public Health services.

5.      A forecast £81.7m underspend (£33.7m overspend for the General fund and a £48.0m underspend on HRA against the latest approved Capital Programme’s Budget).

6.      The application of £9.2m from Corporate contingencies to the appropriate service area

7.      Technical virements within section 3 of Appendix A.

8.      The removal of £0.1m budget from across the Council for corporate subscription budget savings.

9.      The Cost Of Living pressures.

10.  The reduction of £3.6m to the Savings programme to be funded by £3.6m Optimism Bias contingency.

11.  The planned use of £8.5m Capital Receipts in line the flexible use of capital receipts strategy.

12.  Cabinet is asked noted the latest position on the balance sheet risks as set out in Appendix A.

13.  The Officer Executive Decision to distribute grant funding of £0.3m for Free School Meal/Pupil Premium children during the October 2022 School holidays.

 

That Cabinet approved

1.      The temporary redirection of earmarked reserves totalling £13.6m to general reserve

2.      The delegation of authority to the Director of Finance in conjunction with the Deputy Mayor for Finance to realign the general reserve in order to meet Q2 forecast spending requirements and to bring back a report to Cabinet to demonstrate that all budget movements are within the scheme of delegation.

3.      The reprofiling of forecast Capital underspend of £81.7m from 2022/23 into future periods

4.      The acceptance and adjustment to the Council budget for the following grants as outlined in Appendix A Section 12:

• Safer Street Fund (Round 4) - £0.75m

• Prevent Local Delivery Grant Determination - £0.13m

 

Lead officer: Denise Murray


04/10/2022 - Medium Term Financial Plan and Capital Strategy ref: 1485    Recommendations Approved

To present the Medium Term Financial Plan and Capital Strategy. This report will be presented for Cabinet comment/approval and will subsequently be submitted to Full Council.


Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet:

  1. Noted the outlook and projections within the 5-year Medium Term Financial Plan and Capital Strategy
  2. Noted the Reserve Policy
  3. Recommended the Medium -Term Financial Plan for the period 2023/24 to 2027/28 to Full Council for approval.
  4. Recommended the Capital Strategy for the period 2023/24 to 2032/33 to Full Council for approval.

 

Lead officer: Denise Murray


04/10/2022 - Bristol Avon Flood Strategy Funding Strategy ref: 1483    Recommendations Approved

To seek Cabinet approval of the Funding Strategy principles and joint working arrangements with the Environment Agency to deliver the Bristol Avon Flood Strategy.  To note the indicative future allocation of community infrastructure levy funding for the project and authorise the submission of funding bids.

 

Decision Maker: Cabinet

Made at meeting: 04/10/2022 - Cabinet

Decision published: 04/10/2022

Effective from: 12/10/2022

Decision:

That Cabinet

1. Approved the Initial Collaborative Agreement between Bristol City Council and the Environment Agency at Appendix A2, noting the Memorandum of Agreement between Bristol City Council and the Environment Agency (Appendix A1) setting out the partnership relationship between the two organisations for the purpose of delivering the project.

2. Noted the need for development to align with the Bristol Avon Flood Strategy, in advance of adoption of the updated Local Plan.

3. Noted the need to resist development that is incompatible with the emerging Strategy, including in respect of coherence and connectivity of the riverside corridor.

4. Approved the Planning Position Statement at Appendix A3 to reinforce and consolidate Bristol City Council’s current position in respect of development in areas of flood risk.

5. Noted the emerging funding strategy principles as set out in Appendix A4.

6. Authorised the Executive Director, Growth and Regeneration, in consultation with the Deputy Mayor, City Economy, Finance and Performance, and the S151 Officer to prepare and submit a business case to apply to WECA for Economic Development Funds to the value of £10m, to support the delivery of the physical works, as identified as Bristol City Council’s programme allocation in the BAFS SOC.

7. Authorised the Executive Director, Growth and Regeneration, in consultation with the Deputy Mayor, City Economy, Finance and Performance, to approach WECA to prioritise support for the delivery of the physical works in future funding applications.

8. Approved an allocation of Community Infrastructure Levy towards delivery of the Bristol Avon Flood Strategy of £20.395m from FY 2025/6 to 2031/2 inclusive (being typically £3m/yr but £2.395m in 2026/7) into the budget setting process for 2023/24 for Full Council consideration in February 2023.

9. Noted Council’s March 2022 budget allocation of £10m of Reserves towards delivery of the Bristol Avon Flood Strategy.

 

Lead officer: Matthew Sugden


12/09/2022 - Energy Centre Lease – Broughton House, Redcliff ref: 1491    Recommendations Approved

To enable the transfer of Broughton House energy centre, which forms part of the Redcliff heat network to Bristol Heat Networks Limited prior to the BHNL being transferred to Vattenfall Heat Uk Ltd as agreed at Cabinet 12nd July 2022.

Decision Maker: Director: Property, Assets and Infrastructure

Decision published: 03/10/2022

Effective from: 12/09/2022

Decision:

Approval provided by the Director of Property, Asset and Infrastructure and Executive Director of Growth and Regeneration as delegated by the Cabinet on 12th July 2022. To enter a 50-year lease with Bristol Heat Networks Ltd (BHNL) of part of the basement plant room of the residential housing block Broughton House in Redcliff, where an Energy Centre has been installed to provide heat to the District Heat Network.
This lease is being granted at a nil rental, which has been determined as an undervalue (a value below a level that the council could demand if acting commercially). The District Heat Network will generate heat for Commercial and residential properties on the Redcliff Heat Network.

Lead officer: Louise Baker


12/09/2022 - Energy Centre Lease – Canynge House, Somerset Street, Redcliffe ref: 1492    Recommendations Approved

To enable the transfer of Broughton House energy centre, which forms part of the Redcliff heat network to Bristol Heat Networks Limited (BHNL) prior to the BHNL being transferred to Vattenfall Heat Uk Ltd as agreed at Cabinet 12nd July 2022.

Decision Maker: Director: Property, Assets and Infrastructure

Decision published: 03/10/2022

Effective from: 12/09/2022

Decision:

Approval provided by the Director of Property, Asset and Infrastructure and Executive Director of Growth and Regeneration as delegated by Cabinet on 12th July 2022. To enter a 50-year lease with Bristol Heat Networks Ltd (BHNL) of part of the basement plant room in the residential housing block Canynge House in Redcliff, where an Energy Centre has been installed to provide heat to the District Heat Network.
This lease is being granted at a nil rental, which has been determined as an undervalue (a value below a level that the council could demand if acting commercially). The District Heat Network will generate heat for Commercial and residential properties on the Redcliff Heat Network.

Lead officer: Louise Baker


12/09/2022 - Energy Centre Lease – basement, 100 Temple Street ref: 1490    Recommendations Approved

To enable the transfer of 100 Temple Street energy centre, which forms part of the Redcliff heat network to Bristol Heat Networks Limited (BHNL) prior to the BHNL being transferred to Vattenfall Heat Uk Ltd as agreed at Cabinet 12nd July 2022.

Decision Maker: Director: Property, Assets and Infrastructure

Decision published: 03/10/2022

Effective from: 12/09/2022

Decision:

Approval provided by the Director of Property, Asset and Infrastructure and Executive Director of Growth and Regeneration as delegated by Cabinet on 12th July 2022. To enter a 50-year lease with Bristol Heat Networks Ltd (BHNL) of part of the basement plant room of offices at 100 Temple Street, where an Energy Centre has been installed to provide heat to the District Heat Network.
This lease is being granted at nil rental, which has been determined as an undervalue (a value below a level that the council could demand if acting commercially). The District Heat Network will generate heat for Commercial and residential properties on the Redcliff Heat Network.

Lead officer: Louise Baker


16/06/2022 - BSH/HRA Void Refurbishment Works ref: 1489    Recommendations Approved

This provided the quickest and most efficient route to market to provide further void refurbishment services and ensure void properties are turned around and relet quickly.

Decision Maker: Executive Director: Growth and Regeneration

Decision published: 03/10/2022

Effective from: 16/06/2022

Decision:

Approval to award a temporary arrangement for a provider to carry out void refurbishment works to Housing owned properties while a permanent contract is procured. Due to the delay in procuring the new Responsive Repairs framework, the incumbent contractors are at capacity; therefore, properties are currently on hold without work commencing Further resources are required to ensure void works continue and the backlog of properties ‘on hold’ is reduced.

Lead officer: Louise Baker